We are pleased to announce the successful completion and handover of the Majlis Bathroom Renovation project.
• Demolition and Dismantling: Removal of existing tiles, sanitaryware, and bathroom fittings with proper waste disposal and site protection.
• Civil and Plumbing Works: Modifications and upgrades to plumbing points to accommodate the new layout and fixture locations, ensuring compliance with high-quality standards.
• Waterproofing: Application of waterproofing membrane across wet areas to prevent leakage and ensure long-term durability.
• Big Slab Tiles Installation (1500×3000 mm): Supply and precise installation of large-format porcelain tiles for walls and flooring, offering a sleek and seamless finish with minimal joints.
• Ceiling and Lighting Works: Installation of new moisture-resistant gypsum ceiling with integrated LED lighting and exhaust fan for ventilation.
• Sanitaryware & Fittings Installation: Fixing of high-end sanitary items including wash basin, water closet, mixer taps, accessories, and mirror—all installed with precision and care.
• Painting and Final Touch-ups: Final coat of high-moisture-resistant paint on ceiling and touch-up works to ensure a spotless, polished finish.
The project was completed within the scheduled time frame and to the client’s full satisfaction. The renovated majlis bathroom now reflects a contemporary, elegant design with premium finishes, upgraded functionality, and enhanced durability.
We thank our client for the trust and opportunity to deliver this transformation.
